Used this Period: 0 yards
Added this Period: 10.58 yardsUsed Year-to-Date: 26.14 yards
Added Year-to-Date: 28.58 yards
Net Stash Increase for 2020: +2.44 yards
Well, it looks like I went the wrong way with my stash numbers again this week! But I didn't get any fabric just because "I loved it;" instead I got fabric to use in finishing quilts on my list. I should have gone to Hobby Lobby before JoAnn's because they had 40% off all their fabric--and have sold a lot! The fabric I bought at JoAnn's included a lavender for the 5th Shoe quilt (Triple Irish Chain) and 2 golds for the Cowboy Christmas quilt. However, Hobby Lobby had 2 shades of marbled brown that I felt would look nicer, and they had the background fabric I need--all for the Cowboy Christmas quilt. I resisted buying 3-4 other fabrics that I have looked at for a long time--just need to use what I have except to purchase coordinating fabrics to go with what I already have the stash. When I get a couple more quilts made, I'll get those numbers going the right way--I hope!
The number for February is #9. For me that is a Log Cabin/House quilt. I'm trying to decide whether I can get an embroidery incorporated into the house blocks. I'll go downstairs and choose some fabrics tomorrow--not sure what my color scheme will be but I do have my placement figured out.
For today, I've got soup in the crockpot and appetizers made for the game. I only got 2 quilts quilted on the longarm in January and one is loaded. Do you think I can finish a NewFO quilt and 8 quilts on the longarm in February?! I'm probably off by a few. but I think I have 108 quilts that need to be quilted--oh, my!
The number for February is #9. For me that is a Log Cabin/House quilt. I'm trying to decide whether I can get an embroidery incorporated into the house blocks. I'll go downstairs and choose some fabrics tomorrow--not sure what my color scheme will be but I do have my placement figured out.
For today, I've got soup in the crockpot and appetizers made for the game. I only got 2 quilts quilted on the longarm in January and one is loaded. Do you think I can finish a NewFO quilt and 8 quilts on the longarm in February?! I'm probably off by a few. but I think I have 108 quilts that need to be quilted--oh, my!
No comments:
Post a Comment