Tuesday, December 31, 2019

2020 GOALS

2020 GOALS

A) Reduce the LongarmUFO list.  That will start in January.  I will try to quilt 5 quilts per month.  Quilted quilts take up more space than pieced tops--but that would be a good problem to confront!

1/23/20 Scrappy Star String Quilt
1/24/20 Scrappy Star String Quilt
3/25/20 Scrappy 3" Squares Quilt
3/26/20 Pink Bunny Baby Quilt
3/28/20 Pink PaperDoll Applique w/paperdolls in envelope
3/31/20 Twas Night Before Christmas...
4/8/20    3D BowTie Baby
4/24/20  SantaPanel in WindowPane Setting
5/4/20    MultiColored 3D Pinwheel Baby
5/4/20    Fr. Braid Scrappy 

B) Establish a UFO/NewFO quilt top list--this will be A and B lists, as follows:

DONE (2) 1/8/20 1a) Scrappy Star String Quilt (UFO)
DONE 4/20/20 2a) Halloween  Black-Orange Star Quil  t (UFO)(with embroidery--not done)
DONE 12/28/20 3a) Embroidered BFC Shoe #5 (NewFO) ShadowBox
4a) Embroidered Morehead Angels (NewFO)(machine embroidery not done)
5a) Embroidered Redwork Angels (NewFO)(machine embroidery not done)
*6a) Star in Churn Dash (NewFO)
DONE 3/12/20 7a)  Claw in Bear Claw (NewFO)
DONE 6/24/20 8a) Fishing Quilt for DH (NewFO).  Friendly Hand/QuiltersCache
DONE 2/17/20 9a) Log Cabin/House Quilt (NewFO)
10a) Penguin (NewFO)
DONE 6/18/20 11a) 3-Size Blade Dresdan Plate Quilt (NewFO)
DONE 5/27/20 12a) Basket Quilt (NewFO)

*1b) Embroidered Christmas Trees (NewFO)(machine embroidery not done)
2b) Selvage/Scrappy String Quilt (NewFO)
3b) Embroidered Child's Parable Quilt (NewFO)(machine embroidery not done)
DONE 9/11/20 4b) Embroidered BFC Cupcakes (NewFO)
5b) Dizzy Geese in R/W/B (NewFO)
**6b) Cathedral Window (NewFO)
*7b) Sunshine Pineapple (NewFO)
8b) Double Dresdan Quilt (NewFO)
9b) Sandi-Pat Challenge Quilt-Manipulated Quilt in Pinks(NewFO)
DONE 3/2/20 10b) HGlass Baby Quilt (panel)(NewFO)
DONE 8/4/20 11b) Embroidered Ripple SnbnetSue Quilt (NewFO)

DONE 9/22/20 12b) Embroidered Snowman Quilt (OPW)(NewFO)


1c) Embroidered Lil Kids Sports (NewFO)(machine embroidery not done)
2c) Embroidered WIP Flowers (NewFO)(machine embroidery not done)
3c) Embroidered Puppy Tails (NewFO)(machine embroidery not done)
 *4c) Log Cabin Zinger (NewFO)
DONE 7/19/20 5c) Garden Lattice (Cowboy Boots/Hat)(NewFO)
DONE 2/4/20 6c) Pink Bunny Baby Panel (NewFO)
7c) Applique Santa's Helpers (NewFO)
DONE 9/9/20 8c) Embroidered 2x2 Animals (NewFO)(machine embroidery not done*)
*9c) Moda Cowboy boots Quilt (NewFO)(Sandi-Pat Challenge 2020)
*10c) Black/Brown Sawtooth Star Quilt (NewFO)
11c) Moda Xmas Tree Quilt (NewFO)
DONE 11/20/20 12c) TIChain (HLobby Fabric) w/ChildrenOfWorld Emb (NewFO)

DONE 7/18/20 1d)  Colorwheel Curved Log Cabin (NewFO)
DONE 6/28/20 2d) Camping/Fishing Lap Quilt (NewFO)
DONE 10/26/20 3d) Embroidered Bears Baby Quilt (NewFO)
4d) Brown/Gold Light/Dark Sawtooth Star (NewFO)
5d) WIP Flowers Quilt (NeFO)(embroidery not done)
6d) Bullion Rose Quilt (NewFO)(embroidery not done)
DONE 12/1620 7d) Modern Cowboy Boots/Hat (NewFO)


Good luck to all the sewing/quilting goal-setters!  

Sunday, December 22, 2019

Getting Ready for the New Year

Just 3 days before Christmas, 2019, and I've started looking forward to the new year.  My sister and I will be drawing numbers to finish UFOs and/or NewFOs for 2020.  I didn't do this last year and I think I only finished 2 quilts--maybe not even that many as I didn't record finishes.  So, even if we don't finish a quilt every month, we will at least finish some--but I'm hoping for the best!  I will need to reorganize my quilting studio so I will be ready to go on the first day of January!