FABRIC STASH - WEEK 9, 2017 (3/5/17)
Used this Period: 0 yards
Added this Period: 0 yards
Used year to Date: 26.67 yards
Added Year to Date: 3.5 yards
Net Stash Decrease for 2017: 23.17 yards
Nothing to report this week, but a lot of progress was made on the March quilt. All of the 20 blocks are fused, and 7 of the blocks have blanket stitching (by machine) around the various parts of the blocks. After I get all of the blanket stitching completed, I will do some decorative stitching with rayon thread on each block--and then I will be ready to do sashing and assembling of the quilt. I'm aiming for completion by the end of the week.
I continue to work on the ripple stitch afghan in the evenings. I should be able to crochet 4-5 more groups of 6 rows each before I run out of yarn. So many projects, so little time!
Happy stitching this week.
ReplyDeleteHope your sewing week is going as planned. Getting anxious to see your quilt top.
ReplyDelete